Wednesday 15 December 2010

Evaluation

To begin with i thought things was going pretty well, i did get off to a slow start with this project but throughout it i was keeping things pretty much up to date. my final produce was starting to get abit frustrating because my animation was going to have alot of detail within it, im not one of those people who can just create something as simple as a pink ball with eyes and a nose and call it a pig, i have to draw the whole thing out properly.
So before i could even think about using the Adobe flash programme to animate i had to have everything draw and coloured before hand, so i drawn the whole animation out first in programmes like photoshop and sai using my storyboard as a ruff.
had to practise using the flash software to begin with first because i hadn't used it much in the past but lucky with the two training i had within the project helped alot, but because i had already got go the images all i had to do was import them and line them all up to where i wanted them.

Overall it's been challenging trying to create something for a live brief and nerve racking as well because it need to be aimed at a selective audience. sad that my final animation can't be completed jew to problems but hopefully my final outcome is enough.
principles:
Timing.
Pose by Pose.
secondary actions.
slow in slow out.

No comments: